This repository is to submit, review & store Test Cases & Instructions defined for IFC4.3 Alignment Based Reference View Certification, and is developed as part of the IFC Infrastructure MVD Project.
View the Project on GitHub bSI-InfraRoom/MVD-Infra-Test-Instructions
Documentation Code | Test Title | Exchange Code | Test Code | Author | Data Owner | Version | Date |
---|---|---|---|---|---|---|---|
IFC4.3AbRV_E2a_SB01 | (RFI) Track sub-structure for single track | E2a (TRAS) | SB01 | Evandro Alfieri | RFI | 1.0 | DD.MM.YYYY |
This test case addresses the export of the required IFC entities for the exchange of track sub-structure information.
This test case focuses only on track sub-structure (red in picture below). For the track super-structure part (green in picture below), refer to test case IFC4.3AbRV_E2a_SP01, of which SB01 is a pre-condition.
Snippet:
Refer to Test Case Imports to know the prerequisites for the present test.
The Expected Results section lists the material that will be used to assess the fulfilment of capabilities.
This is a test-driven process: refer to the Validation Criteria to understand what is required by the test
under construction, check CT for product shape
The Test instruction addresses the import and export of the following IFC Entities & Concept Templates:
These entities represent a test-specific subset of the wider AbRV_E2a exchange and the overall AbRV MVD. The scope of the test shall not be used as a definitive scope of the exchange, or of the MVD
These concept templates represent a test-specific subset of the wider AbRV_Ex exchange and the overall AbRV MVD, that must be correctly exported to meet the validation criteria. The scope of the test shall not be used as a definitive scope of the exchange, or of the MVD
This test case utilises the dataset collected in the Dataset folder and summarised in the table below. For more details on each item see Dataset description.
Filename | Type (format) | Description |
---|---|---|
TrackCrossSection | drawing (png) | Track cross section to be used as example |
All validation criteria (and usages) of predecessors' tests shall be verified for this test too (regression test principle). Prerequisites for the present test case are listed below.
TI Code | Test Instruction Title | Comments |
---|---|---|
IFC4x3_AbRV-E1-AL22 | (RFI) Two alignments without cant | For the test to be passed, the track sub-structure shall be modelled ONLY for the Primary Route (i.e., Alignment 1_Primary route) |
For certification of capabilities the only source will be:
MVDCode
ExchangeCode
TestCode
_SoftwareVendor
.ifc
(Example: IFC4.3AbRV_E2a_SB01_AmazingSoft.ifc
) For this test case to be considered passed all capabilities listed in this section, and the ones of pre-required tests shall be verified, with no exception.
RULE ID | CRITERIA | VALUE [examples] | ENTITY (if applicable) | CT (if applicable) |
---|---|---|---|---|
GENE_00 | All validation criteria of precondition's tests shall be verified | na | na | |
GENE_01 | All requested entities (and attributes) exist in file | As per Entities Table | na | na |
Element | Attribute | Value | Notes |
---|---|---|---|
IfcEarthworksFill | Name | Corpo del rilevato | |
PredefinedType | SUBGRADE | ||
IfcCourse | Name | Strato di sub-ballast | Junction layer in the figure |
ObjectType | Junction | ||
PredefinedType | USERDEFINED | ||
IfcCourse | Name | Strato di supercompattato | Foundation layer in the figure |
ObjectType | Foundation | ||
PredefinedType | USERDEFINED |